Project Details
-
Project Name
:
SK Nitish Apartments
-
Location
:
Gopal Nagar, Near New Collector Office, Chengalpattu
-
Project type
:
Premium residential Apartments
-
Floor space
:
4128
-
Project overall size
:
12384
-
No. of Units
:
12
Specifications
-
Foundation: RCC Framed Structure
-
Flooring: 2'x2' Vitrified Tiles
-
Toilet: Glazed Tiles Up To 7 Feet Height.
-
Kitchen: Color Granite Top With Stainless Steel Sink
Glazed Tiles For 2 Feet Height Above The Kitchen Platform.
-
Joinery:
- Main Door With Teak Wood Frame With Teak Paneled
Door Other
Doors Flush & WPC Frame And Shutters For Toilets Windows
With UPVC Sliding Glazed Shutters With Ventilators With Fixed Louvers.
-
Electrical: Three Phase Connection Required Lights. Fan & Plug Points In Allroom’s
A/C Point For Bed Rooms T.V & At Living And Bed Rooms Geyser Point
In Toilets.
-
Sanitation: Parryware Make White EWC, IWC, Wash Basin, Toilet Fitting Are Of
Parryware Brand.
-
Painting:
- Internal Walls With Emulsion Paint With Touch-Up Putti, External Paint
With Exterior Emulsion Main Door With Polish All Other Doors And
Grills With Enamel Paint.
-
Lift: Lift Speciality Available.
-
General:
- Building As Per 100% Vaastu.
- Loft And Shelf In All Bedrooms And Kitchen. Safety Grill For Windows.
- Grill Gate At Main Door.
- Grill Enclosure For Kitchen Wash Balcony {Extra Work}.
- 24x7 Generator Backup For All Common Area Only.
- Dual Meter For Main And DG Power.
- Brick Septic Tank With 24,000 Lts Capacity.
- Watchman Room With A Toilet At Stilt Floor.
- RCC Water Sump 8000 Litters.
- RCC Overhead Water Tank.
- 6” Dia Borewell.
- 4’-6” Height Compound Wall With Compound Gates.
- Common Cloth Drying Rod Provision At Terrace {Extra Work}.
- Rain Water Harvesting As Directed By Local Body Norms.
Project Location: SK Bharathi Apartments
Site Area: 5392 Sq.Ft.
Area Calculation Details
| Flat |
Carpet Area A |
Plinth Area B |
Common Area C (C 25%) |
Total Area D (B+C) |
UDS (BX0.54) |
| F1 | 770 | 874 | 219 | 1093 | 472 |
| F2 | 700 | 787 | 197 | 984 | 425 |
| F3 | 680 | 766 | 192 | 958 | 414 |
| F4 | 770 | 874 | 219 | 1093 | 472 |
| S1 | 770 | 874 | 219 | 1093 | 472 |
| S2 | 700 | 787 | 197 | 984 | 425 |
| S3 | 680 | 766 | 192 | 958 | 414 |
| S4 | 770 | 874 | 219 | 1093 | 472 |
| T1 | 770 | 874 | 219 | 1093 | 472 |
| T2 | 700 | 787 | 197 | 984 | 425 |
| T3 | 680 | 766 | 192 | 958 | 414 |
| T4 | 770 | 874 | 219 | 1093 | 472 |
| 8,760 | 9,903 | 2,481 | 12,384 | 5,349 |
| S.No |
PAYMENT SCHEDULE |
PERCENTAGE |
| 1 | Booking Advance | 10 % |
| 2 | Commencement of Foundation | 20 % |
| 3 | Commencement of Ground Floor | 20 % |
| 4 | Commencement of 1st Floor | 25 % |
| 5 | Commencement of 2st Floor | 10 % |
| 6 | Commencement of 3st Floor | 10 % |
| 7 | Commencement of Flooring Respective Unit | 2.50 % |
| 8 | Handing Over | 2.50 % |
Construction progress content goes here.